Subcontractor Rates

DFW Custom Homes is pleased to offer competitive rates to our subcontractor partners. We believe these rates to be fair and accurate material and labor costs that can be relied upon by all parties during the construction of each custom home (our clients, financing institutions, our subcontractors, and DFW Custom Homes management). Please note that our rates are periodically adjusted for fluctuations in material and labor costs.

 

The rates listed in the table below represent the amount that DFW Custom Homes will pay for the listed activities. As a subcontractor working with DFW Custom Homes, you agree via your signed trade partner packet to be bound by the published subcontractor rates below unless a variance is requested and approved in advance of any work being performed. Please note that if you need a variance from the below rates for any reason (example: sharp or temporary fluctuations in material and/or labor costs), you must submit a detailed estimate to your project manager for approval prior to any work being performed.

 

We will assume that you agree to be compensated according to the below listed subcontractor rates if (1) you begin work prior to or without providing us an estimate or (2) if your previous estimate has expired and you begin work anyway. It is each subcontractor's responsibility to inform a project manager of any changes in material and/or labor costs prior to any work being performed, and to only work under approved, valid and unexpired estimates if a variance is needed. Scope of Work not included on this list must be approved in advance by a Project Manager to be eligible for payment.

Table Last Revised: 12/27/2021

Cost Category
Scope of Work
Unit of Measure
Amount
5002 - Builder's Risk Insurance
Builder's Risk Insurance
Total Per Project
$1,100.00
5004 - Portable Toilet
Portable Toilet Rental
Per Month
$110.00
5005 - Plans & Engineering
Architectural Plans
Per Square Foot of Area Under Roof
$0.70
5005 - Plans & Engineering
Topographic Survey & Drainage Plan
Total Per Project
$1,500.00
5005 - Plans & Engineering
Wind Bracing Plan
Total Per Project
$250.00
5005 - Plans & Engineering
Foundation Engineering
Total Per Project
$750.00
5005 - Plans & Engineering
Energy Plan
Total Per Project
$200.00
5005 - Plans & Engineering
Soils Report
Total Per Project
$1,500.00
5005 - Plans & Engineering
Form Survey
Total Per Project
$300.00
5007 - Excavation
Excavation
None. Written estimate required before work begins.
TBD
5007 - Excavation
Demolition
None. Written estimate required before work begins.
TBD
5008 - Utilities & Infrastructure
Setup T-Pole (Materials & Labor)
Total Per Project
$500.00
5009 - Retaining Walls
Retaining Walls (Materials & Labor)
None. Written estimate required before work begins.
TBD
5011 - Home Design
Home Design
Per Square Foot of A/C Space
$0.50
5013 - Termite Treatment
Termite Treatment (Materials & Labor)
Total Per Project
$1,200.00
5014 - Foundation
Pump Truck Rental
Total Per Project
$1,200.00
5014 - Foundation
Slab (Materials & Labor)
Per Square Foot of Foundation Area
$8.50
5015 - Plumbing Infrastructure
Natural Gas Drops (Materials & Labor)
Per Natural Gas Drop
$750.00
5015 - Plumbing Infrastructure
Plumbing Drops (Materials & Labor)
Per Plumbing Drop
$750.00
5015 - Plumbing Infrastructure
Plumbing Trenches & Connecting Lines Outside of Structure (Materials & Labor)
Total Per Project
$1,000.00
5016 - Electrical
General Electrical (Materials & Labor)
Per Square Foot of Area Under Roof
$4.50
5016 - Electrical
Recessed LED Lights (Materials & Labor)
Each
$50.00
5017 - Framing Material
Framing Material
Per Square Foot of Area Under Roof
$12.50
5018 - Framing Labor
Framing Labor
Per Square Foot of Area Under Roof
$7.50
5021 - Windows
White Vinyl (Materials & Labor)
Each
$300.00
5021 - Windows
Brown Vinyl (Materials & Labor)
Each
$450.00
5021 - Windows
Black Vinyl (Materials & Labor)
Each
$500.00
5022.01 - Rock Siding (Exterior & Interior)
Rock Siding (Materials & Labor)
Per Square Foot of Siding
$16.00
5023 - Brick Siding (Exterior & Interior)
Brick Siding (Materials & Labor)
Per Square Foot of Siding
$8.00
5024 - Wood Siding (Exterior & Interior)
Wood Siding (Materials & Labor)
Per Square Foot of Siding
$5.50
5025 - Stucco Siding (Exterior & Interior)
Stucco Siding (Materials & Labor)
Per Square Foot of Siding
$10.00
5026 - Metal Siding (Exterior & Interior)
Metal Siding (Materials & Labor)
Per Square Foot of Siding
$12.00
5028 - Entry Door
Entry Door (Materials & Labor)
Each
$2,500.00
5029 - Exterior Doors
Exterior Doors (Materials & Labor)
Each
$600.00
5030 - Fireplace & Mantle
Mantle (Materials & Labor)
Each
$1,000.00
5030 - Fireplace & Mantle
Fireplace (Materials & Labor)
Each
$1,500.00
5031 - Roofing
Composite Shingles - 10/12 to 12/12 Pitch (Materials & Labor)
Per Square
$180.00
5031 - Roofing
Specialty Materials
None. Written estimate required before work begins.
TBD
5031 - Roofing
R Panel Metal - 10/12 to 12/12 Pitch (Materials & Labor)
Per Square
$270.00
5031 - Roofing
Composite Shingles - 8/12 Pitch (Materials & Labor)
Per Square
$180.00
5031 - Roofing
Standing Seam Metal - 8/12 Pitch (Materials & Labor)
Per Square
$360.00
5031 - Roofing
R Panel Metal - 8/12 Pitch (Materials & Labor)
Per Square
$280.00
5031 - Roofing
Standing Seam Metal - 10/12 to 12/12 Pitch (Materials & Labor)
Per Square
$402.00
5032 - HVAC
Electrical HVAC System (Materials & Labor)
Per Square Foot of A/C Space
$4.25
5033 - Skylights
Skylights (Materials & Labor)
None. Written estimate required before work begins.
TBD
5034 - Insulation
Spray Foam Insulation (Materials & Labor)
Per Square Foot of A/C Space
$2.75
5035 - Sheetrock, Tape & Texture
Sheetrock, Tape & Texture (Materials & Labor)
Per Square Foot of A/C & Garage Space
$4.00
5036 - Cabinets
Cabinets (Materials & Labor)
Per Square Foot of A/C Space
$4.50
5038 - Lights & Fans
Lights & Fans (Materials & Labor)
None. Written estimate required before work begins.
TBD
5039 - Counter & Vanity Tops
Counter Top (Materials & Labor)
None. Written estimate required before work begins.
TBD
5039 - Counter & Vanity Tops
Vanity Top (Materials & Labor)
None. Written estimate required before work begins.
TBD
5040 - Interior Doors & Trim Material
Interior Trim (Materials & Labor)
Per Square Foot of A/C Space
$3.50
5040 - Interior Doors & Trim Material
Interior Doors (Materials & Labor)
Per Square Foot of A/C Space
$3.00
5041 - Paint & Stain
Paint & Stain For Exterior & Interior (Materials & Labor)
Per Square Foot of Area Under Roof
$4.50
5043 - Lockout
Lockout (Materials & Labor)
Total Per Project
$500.00
5044 - Knobs & Hardware
Knobs & Hardware (Materials & Labor)
None. Written estimate required before work begins.
TBD
5045 - Garage Door & Opener
Specialty Door (Materials & Labor)
None. Written estimate required before work begins.
TBD
5045 - Garage Door & Opener
Standard Double Garage Door & Opener (Materials & Labor)
Each
$2,750.00
5045 - Garage Door & Opener
Standard Single Garage Door & Opener (Materials & Labor)
Each
$1,750.00
5046 - Tile (Tub & Shower)
Tile Shower - Master/Large Walk In (Materials & Labor)
Each
$3,500.00
5046 - Tile (Tub & Shower)
Bath Tub - Master (Materials & Labor)
Each
$1,000.00
5046 - Tile (Tub & Shower)
Tile Shower - Small Walk In (Materials & Labor)
Each
$2,000.00
5046 - Tile (Tub & Shower)
Basic Tub & Shower Combo (Materials & Labor)
Each
$1,500.00
5047 - Kitchen Backsplash
Kitchen Backsplash (Materials & Labor)
Total Per Project
$750.00
5048 - Appliances
Home Appliance Package (Materials & Labor)
None. Written estimate required before work begins.
TBD
5049 - Flooring
Tile, Wood, Carpet & Vinyl Flooring (Materials & Labor)
Per Square Foot of Installed Flooring
$8.00
5049 - Flooring
Stained Concrete Flooring (Materials & Labor)
Per Square Foot of Stained Concrete Flooring
$2.50
5050 - Plumbing Fixtures
Plumbing Fixtures (Materials & Labor)
Each
$400.00
5051 - Mirrors & Shower Doors
Mirrors & Shower Doors (Materials & Labor)
None. Written estimate required before work begins.
TBD
5052 - Ornamental Iron
Ornamental Iron (Materials & Labor)
None. Written estimate required before work begins.
TBD
5053 - Ceiling Beams
Ceiling Beams (Materials & Labor)
None. Written estimate required before work begins.
TBD
5054 - Septic System
Traditional Septic System (Materials & Labor)
Each
$13,000.00
5054 - Septic System
Aerobic Septic System (Materials & Labor)
Each
$8,000.00
5055 - Propane Tank
Propane Tank (Materials & Labor)
None. Written estimate required before work begins.
TBD
5056 - Electric Generator
Electric Generator (Materials & Labor)
None. Written estimate required before work begins.
TBD
5057 - Driveway & Walkway
Concrete (Materials & Labor)
Per Square Foot
$5.50
5057 - Driveway & Walkway
Road Base (Materials & Labor)
Per Square Foot
$1.50
5057 - Driveway & Walkway
Asphalt (Materials & Labor)
Per Square Foot
$2.50
5058 - Final Grade
Final Grade (Materials & Labor)
Total Per Project
$3,000.00
5059 - Landscaping & Sprinklers
Landscaping & Sprinklers (Materials & Labor)
None. Written estimate required before work begins.
TBD
5060 - Gutters & Downspouts
Gutters & Downspouts (Materials & Labor)
Per Linear Foot
$5.50
5061 - Fence & Gate
Fence & Gate (Materials & Labor)
None. Written estimate required before work begins.
TBD
5063 - Swimming Pool
Swimming Pool (Materials & Labor)
None. Written estimate required before work begins.
TBD
5065 - Final Cleaning
Final Cleaning (Materials & Labor)
Per Square Foot of A/C Space
$0.50
5066 - Inspections
Inspections
Each
$150.00
5069 - Mailbox
Mailbox (Materials & Labor)
None. Written estimate required before work begins.
TBD
5070 - Window Treatment
Window Treatment (Materials & Labor)
None. Written estimate required before work begins.
TBD